Final Assembly
Home

Introduction

Project overview

Bill of Materials & Costs

Material Properties

Cutting Holes

T Nuts

Manufacturing the parts

Cut List

Top and Bottom Pieces

Brace preassembly

Assembly of Box

Precision Ports

Preparing to Finish

Finishing

Final Assembly

Grill

Final Product

Add closed cell tape to Precision Port to seal it to the box.
Insert Precision Port and use #6 sheet rock screws (pre-drill pilot holes) into the box. Note the hole for grill guide.
Insert grill guides
Short out gold terminals on driver
Add wires to driver terminals
Insert driver and screw down bolts into T nuts
Connect driver and plate amp wires, drill pilot holes for amp screws and screw to box
Copyright 2005, Trtinkerer