Construction
Continued... |
 |
|
|
|
|
 |
The front driveway
loop has been filled in and rough graded as this will now become
the back of the building |
|
|
|
|
 |
Most of the
pews have now been installed.
Viewed from the
altar area (left) and looking toward the altar area
(right) |
|
|
|
|
|
 |
The Music Director's
old office walls have come down as viewed from the current side
entrance (left). Her office has been temporarily
located to one of the lavatories (right) while
the new choir room tile has been installed (below) |
 |
|
 |
|
|
|
|
 |
The wall between the
old boiler and computer rooms has come down (left) and
the old Sacristy has been dismantled and will become a hallway
to the new section of the building (right) |
 |
|
|
|
|
 |
And there were
evenings and there were mornings a thirty-third week... |
 |