Removed water damaged drywall, wood, and removed water logged fiberglass insullation (at exterior wall). Set dehumidifier in place, and enclosed immediate area in plastic sheathing, and ran for a few days. Rebuilt curb, reinsullated, installed vapor barrier, and cement board. Soaked, and scraped old adhesive off of tile backs, and used close matching tile at inside of curb to make the job work due to shortage of original. Installed tile, grouted, silicone caulked curb/ floor/ wall, wall/ wall, wall/ floor, and door trim/ tile junctions with a high quality bead application. Reinstalled shower door, and cleaned tile, and glass for a complete, like new finish.